Biomass to Electricity Project. Celulose Irani, Brazil


EEcoSecurities developed the Project Design Document (PDD) for the electricity generation from biomass proposal by Celulose Irani at the manufacturing plant that have in the Campina da Alegria district (State of Santa Catarina, Brazil). The aim was to reduce the proportion of electricity from the local network to minimize GHG emissions linked to the mains supply (with high weight of fuel oils). The proportion extracted from the overall grid was 44% (56% came from generation plants from existing biomass and small hydroelectric plants).



The project incorporated the construction of a biomass generation plant with a capacity of 9.43 MW, which would meet the growth in paper production (and derivatives). By burning waste wood chips and unused forest residue from the area, electricity was generated by a more energy-efficient process using technology that was safe for the environment and from paid for by the national bill. The raw material that resulted from the process had until then been treated as waste, which meant that its use guaranteed the reduction in methane generation, a by-product of the process of decomposition.



EcoSecurities was responsible for appraising the project for carbon credits (CERs) issued by definition to CDM (Clean Development Mechanism), and manage their sale via ERPA (CDM Emission Reduction Purchase Agreement).



The project's contribution to sustainable development was significant. At local level it supposed increased employment, and the national balance sheet included the promotion of clean technologies and the diversification of power generation sources in the country. This demonstration of the potential use of biomass as fuel favoured its adoption and the reduction of uncontrolled forestry landfills. At corporate level this allowed Celulose Irani to achieve its goals of cleaner production and respect the environmentally. The use of clean and efficient technologies and conservation of natural resources are part of Agenda 21 for Sustainable Development Criteria in Brazil.

CLIMATE CHANGE PROJECTS

  • Proyecto

    Emissions rights portfolio assessment

    Emission rights strategy management for chemical group Soda Polska Ciech, Poland. [+]

  • Proyecto

    Cultivation Jatropha Gambia

    Pilot project for the extension of this woody species in desert areas through... [+]

  • Proyecto

    Climate Change Training

    IIMA developed and delivered this first Tecniberia course ‘Companies and Climate Change’ [+]

  • Proyecto

    Biomass to Electricity Project

    EcoSecurities were responsible for the process of obtaining CERs for a power generation activity… [+]

  • Proyecto

    Avoided deforestation Chaco, Argentine

    First project REDD in 45,000 ha of forest soil in the Argentine Chaqueño Park [+]

Contact us if you wish to know more about Climate Change projects.

Calculator

Calculator

CO2 Calculator

Calculate emissions from your activities and find out your carbon footprint.

More [+]

Consulting

Wine Industry Carbon Footprint

Pago del Vicario calculates the GHG emissions generated by the organisation and the production of PENTA red wine.

More [+]

Emissions Rights Management

EMISSIONS RIGHTS PORTFOLIO ASSESSMENT

Emission rights strategy management for chemical group Soda Polska Ciech, Poland.

More [+]

Ecosecurities

GHG emissions reduction

Sourcing, developing and trading emission reduction credits.

More [+]

AND ALSO...

Jatropha cultivation in Africa

Jatropha

Pilot project for the extension of the jatropha cultivation for biodiesel manufacture.

More [+]

AT A CLICK

REDD

Avoided deforestation in Argentina

Avoided deforestation project and supression of the causes of forest degradation.

More [+]

Proyects

  • Proyecto

    Almacenamiento Subterráneo G.L.P. Cartagena

    REPSOL encargó a IIMA la elaboración del EsIA de las primeras instalaciones de almacenamiento subterráneo... [+]

  • Proyecto

    Conexión Subestaciones Burgos

    IIMA elaboró el Estudio de Impacto Ambiental de la conexión para evacuación eléctrica de un conjunto de... [+]

  • Proyecto

    Methodological research biodiversity

    Methodological research into a remuneration programme intended for the conservation of biodiversity. [+]

  • Proyecto

    Emissions rights portfolio assessment

    Emission rights strategy management for chemical group Soda Polska Ciech, Poland. [+]

  • Proyecto

    Gasoducto de la conexión con Francia

    ENAGAS encargó a IIMA el Estudio de Impacto Ambiental del gasoducto, con dificultad por el rechazo social y... [+]

  • Proyecto

    Legalización ambiental planta regasificación

    IIMA colaboró decisivamente en la elaboración de un estudio para la legalización ambiental de la planta... [+]

  • Proyecto

    Gestión Integrada Zonas Costeras

    Elaboración de un informe marco sobre la situación del GIZC en Europa, con diagnóstico de la nueva forma... [+]

  • Proyecto

    Oleoducto Conquista-Almodóvar del Campo

    CLH encargó a IIMA la Asistencia Técnica Ambiental del desdoblamiento del Oleoducto Rota-Zaragoza en el... [+]

  • Proyecto

    Oleoducto destilados Cartagena-Puertollano

    IIMA realizó el Estudio de Impacto Ambiental del proyecto del nuevo Oleoducto Cartagena-Puertollano, cuya... [+]

  • Proyecto

    Biomass to Electricity Project

    EcoSecurities were responsible for the process of obtaining CERs for a power generation activity… [+]

  • Proyecto

    Medidas compensatorias gasoducto LIC

    IIMA elaboró las Medidas correctoras del gasoducto Córdoba-Santa Cruz de Mudela, cuyo paso por un LIC... [+]

  • Proyecto

    El plumbismo en España

    IIMA estudió la incidencia del plumbismo en especies de aves cazables de zonas humedas, ante la aparición... [+]

  • Proyecto

    Norma 352R1 Expedientes Declaración Impacto Ambiental

    Elaboración de la Norma 532 para la Evaluación de Impacto Ambiental en proyectos desarrollados por la... [+]

  • Proyecto

    Asistencia integral gasoducto eje transversal

    Este Proyecto supuso un hito en cuanto a la cuantificación del impacto real en la fauna ocasionado por... [+]

  • Proyecto

    Ordenación Gestión Espacio Natural Villafáfila

    IIMA planteó el modelo de Ordenación de los Recursos Naturales del espacio protegido, determinando la... [+]

  • Proyecto

    Ampliación capacidad gasóleo Loeches

    CLH encargó a IIMA la realización del Estudio de Impacto Ambiental del proyecto de ampliación de las... [+]

  • Proyecto

    Plan de Turismo Integral Cozumel, México

    Estudio de alternativas de desarrollo para la implementación de un turismo sostenible en una zona de alto... [+]

  • Proyecto

    Almacenamiento hidrocarburos Zaragoza

    CLH encargó a IIMA el Estudio de Impacto Ambiental de la ampliación de la planta de almacenamiento de... [+]

  • Proyecto

    Centro gestión fin vida vehículos Madrid

    Servicio Integral de los diferentes aspectos ambientales de un desguace en el marco de una normativa cada vez... [+]

  • Proyecto

    Mejora ambiental hábitats avifauna para líneas eléctricas

    IIMA realizó un estudio para cuantificar la peligrosidad de las líneas eléctricas dentro del LIC “Cuencas... [+]